Clarify the concession first
Compile the decisions, operator identity and term. If renewal is pending, assess possible continued validity separately.
Section 96 SeilbG protects public cableways against unreasonable competition. Concession records, operating evidence and procedural steps explained.
Mag. Christopher Angerer, Rechtsanwalt
Your lawyer for ski and alpine accidents
Ski and alpine accidents are complex and emotional. One lawyer you know, from the first question to the courtroom. Strong practical background (former ski instructor, mountain rescuer and dog handler).
In larger cases, the work is handled as a team (lawyer, trainee lawyer, legal assistant). Court hearings and negotiations always remain a matter for the lead lawyer.
A public cableway undertaking may oppose another planned cableway under § 96 of the Austrian Cableways Act 2003 if the new project would create competition that the undertaking cannot reasonably be expected to tolerate. This protection lasts for the duration of the concession term. Whether this protection prevents a specific project depends on the protected installation, the competing service, and substantiated economic effects.
Identify the concession records and procedural stage. The result suggests the next assessment step and does not decide authorisation.
Would you like to discuss your cableway project? Continue to the enquiry form.
Compile the decisions, operator identity and term. If renewal is pending, assess possible continued validity separately.
Secure reliable project details and compare the transport services. Separate substantiated demand effects from uncertain assumptions.
Provide authority documents and proof of service. Party status, access to the file and objection deadlines require a case-specific procedural assessment.
§ 96 SeilbG restricts the authorisation of other cableways to protect existing public cableway undertakings. The exclusive right to construct and operate protects the undertaking against competition from another installation that it cannot reasonably be expected to tolerate. Neither a new competitor nor an anticipated fall in revenue, by itself, satisfies that condition.
The provision establishes neither a fixed loss threshold nor a protected geographical distance. Consequently, the legal assessment must provide a reasoned explanation for why this specific project would cross the threshold of unreasonable competition. A general reference to investment costs or the existing market position fails to answer that question.
Identify the undertaking that holds the rights for the existing public cableway. Public cableways must provide general passenger services during the periods specified in their concession under § 5 SeilbG. Collect the concession decision, its amendments, the duration, and the operator’s identity. Because a shared brand used by several mountain railways does not establish who holds each right, you must still determine the specific rights holder.
The concession term limits the duration of competition protection. If a renewal application is pending, examine the continued validity of the concession under § 28 SeilbG separately. Opposing a competing project does not extend the existing concession. Record the services actually provided and any suspension of operations so that the legal records and the economic baseline correspond.
Compare the existing transport service with the specific proposed service. Identify which departure points and destinations the services connect, which passengers the services address, and which operating periods or seasonal services overlap. Route plans, station locations, capacity, and connections to other services help explain a possible shift in demand.
Proximity alone fails to provide a complete picture of the competitive effect. A new installation may generate additional demand or divert existing passengers, and the assessment must include both possibilities. Identify which project details are documented and which assumptions remain uncertain. This comparison prepares the individual assessment, but it is not a statutory checklist of criteria.
A substantiated submission connects passenger numbers, revenue, utilisation, and operating costs with a forecast for the competing project. It is useful to compare the expected development with the new installation against the scenario without it. Explain how you calculate the possible loss of demand and describe the effects you expect on the economic viability of the protected operation.
Distinguish project effects from other causes, including changed snow conditions, interruptions to your own service, or a general decline in demand. Data spanning several years and transparent scenarios help contextualize exceptional seasons. An economic expert report can explain the relationships, and the legal assessment of reasonableness remains a separate question. § 96 contains no blanket percentage that automatically renders a project impermissible.
Identify early which cableway proceedings concern the competing project and which authority is responsible. § 21 SeilbG requires a concession for the construction and operation of a public cableway. Tell the authority which of your rights under § 96 are affected. Explain why this should confer party status under § 8 AVG in those proceedings. A purely economic interest does not settle that question.
A party may request access to the file under § 17 AVG, though protected interests and statutory exceptions may limit its scope. When preparing objections, check notices, hearing announcements, and deadlines immediately. Under the conditions set out in § 42 AVG, late objections can result in the loss of party status. Competition protection does not automatically grant participation in every subsequent construction or operating procedure, and § 40 SeilbG separately regulates the parties to construction approval proceedings.
Combine the concession records, known project details, and economic analysis into a reasoned submission. Specify the alleged unreasonable competition, the evidence offered, and the decision sought from the authority. If a decision has already been issued, you must examine the service of that decision, party status, and possible remedies within the context of those particular proceedings.
A letter from the operator to the project developer does not, by itself, stop construction. Concession law provides the route to assert protection under § 96, which remains distinct from any separate claim under the Austrian Unfair Competition Act, the UWG. The construction exclusion area under § 53 SeilbG addresses a different issue. For legal assessment, the concession decision, correspondence from the authority and reliable operating data are therefore more useful than a general demand to remain free of competition.
§ 96 SeilbG specifies no fixed distance, so the relevant test is whether competition during the concession term would be unreasonable. A separate assessment remains necessary for the construction exclusion area under § 53 SeilbG.
An expected revenue loss alone does not establish party status. § 8 AVG requires a legal entitlement or legal interest. The undertaking must explain the particular effect on the right under § 96 in the relevant proceedings.
The competent authority decides whether to authorise the project. The existing operator must raise the competition protection objection in the appropriate proceedings. Your own declaration cannot replace either the authority’s decision or an assessment of possible remedies.
The sooner we secure the evidence, the better we can enforce your claim. Call us directly or send an email, callback within one business day.